NSW law draws one very specific line through every asbestos job in the state: ten square metres. On one side of that line, a small bonded job can be done without a licence, carefully. On the other side, it is licensed work, full stop. Most of the trouble people get into starts with not knowing which side of the line they are standing on.
The short version
- In NSW you do not need a licence to remove up to 10 square metres of non-friable (bonded) asbestos in total. SafeWork NSW publishes the rule and the conditions that come with it.
- More than 10 square metres of bonded asbestos requires a Class B licensed removalist. Friable asbestos, in any quantity at all, requires a Class A licence.
- Asbestos waste can only go to a landfill licensed to accept it. Putting it in a household bin, reusing it or dumping it is illegal.
- The NSW EPA can issue on the spot fines of up to $7,500 for an individual and $15,000 for a company over mishandled asbestos waste, and court penalties run far higher.
- Druid Removal takes on bonded asbestos jobs within the 10 square metre unlicensed limit, and will tell you straight when a job needs a licensed Class A or B removalist instead.
The rule itself, in plain words
Under the NSW work health and safety rules, an unlicensed person may remove non-friable asbestos as long as the total area does not exceed 10 square metres. SafeWork NSW sets the rule out here, along with the conditions: follow the code of practice, understand the health risks, and do asbestos awareness training before touching the material.
Everything above that threshold is licensed work. A Class B licence covers bonded asbestos in quantities over 10 square metres. A Class A licence covers friable asbestos, and there is no unlicensed quantity of friable material. Not a sheet, not a fragment, none.
Notice what the rule is actually measuring. It is not the size of the job in hours or dollars. It is the total area of asbestos containing material being removed. A small bathroom can be over the line while a long garden fence sits under it.
Friable and non-friable, the difference that decides everything
The whole legal structure hangs off one physical distinction, so it is worth being precise about it.
What bonded sheeting actually is
Non-friable, or bonded, asbestos is material where the fibres are locked into a hard matrix, usually cement. The fibro sheeting on thousands of Northern Rivers walls, fences and eaves is the classic case. While the sheet is intact, the fibres stay put, which is precisely why the law treats a small quantity of it differently.
Friable asbestos is anything that can be crumbled by hand pressure: old pipe lagging, sprayed insulation, and badly weathered or fire damaged sheeting that has lost its bond. Friable material sheds fibres into the air, which is where the danger lives, and it is Class A licensed work in any amount.
Notice that the classification follows the condition of the material, not the name on the original packet. A sheet that left the factory bonded does not stay bonded forever. Decades of coastal weather, a house fire, or a previous owner's enthusiastic attempt at demolition can all leave material that crumbles where it once held firm, and the moment it crumbles it has changed legal categories. This is why a job gets assessed as it is found, not as it is described over the phone.
Homes built before 1990
The reason this matters to so many people here is the age of the housing stock. The NSW EPA's guidance for householders is blunt about it: homes built before 1990 are likely to contain asbestos somewhere, in wall sheeting, eaves, wet area linings, fences or roofing. Around Murwillumbah, Lismore and the older streets of Tweed Heads, that describes a very large share of the houses.
What ten square metres looks like in practice
Ten square metres is smaller than people imagine. It is a patch of wall about the size of a double garage door. One side of a small garden shed can get you most of the way there. A whole fence line of super six sheeting is over the limit before you have finished measuring it.
The other measuring mistake is counting only the piece you plan to remove this weekend. The allowance is 10 square metres of material in total, not 10 square metres per visit, and splitting one oversized job into a series of small ones is not a workaround. It is the same job, over the limit, done in instalments. If the honest total for the work is more than 10 square metres, it is Class B work from the first sheet.
This is why the honest first step on any suspected asbestos job is a tape measure and not a crowbar. Measure the area, decide friable or bonded, and only then decide who is allowed to do the work. If there is any doubt about whether material contains asbestos at all, treat it as if it does until testing says otherwise.
Doing it yourself, and the parts people skip
The 10 square metre allowance is not a licence to treat fibro like ordinary building waste. The SafeWork conditions exist because the failure points are well known: cutting or breaking sheets instead of removing them whole, dry sweeping the debris, and working without protective equipment or containment.
Done properly, a small bonded removal means keeping the material wet, taking sheets out whole where possible, double wrapping in heavy plastic, and labelling the wrapped load. The material never goes through a chipper, never gets broken up to fit a bin, and never rides loose in a trailer.
The tools matter as much as the sequence. Power saws, grinders, sanders and high pressure water blasting are the fastest ways to turn a bonded sheet into airborne fibre, which is exactly why the safe method looks slow and old fashioned: unscrew, lift, lower, wrap. Nothing about it is complicated. All of it is deliberate.
If reading that list feels like more than the fence panel is worth, that is a reasonable conclusion, and it is the point where getting someone in stops being a luxury. It is also worth reading before deciding to save money on a renovation strip out by doing the demolition yourself first.
Disposal is where most people get caught
Removal is only half the job, and the half that generates most of the penalties is what happens to the material afterwards. The rule is simple: asbestos waste goes to a landfill licensed to accept it, and nowhere else. It cannot go in a household bin. It cannot go in a skip with mixed waste unless the skip provider accepts it. It cannot be reused as fill, and it absolutely cannot be dumped.
Most facilities that take asbestos want a booking or notification before you arrive, so the trip needs to be planned rather than improvised on a Saturday afternoon.
Getting the load to the gate matters too. Wrapped bundles travel flat, sealed and secured, not stacked loose against the trailer rails, and the paperwork from a licensed facility is worth keeping. That docket is the receipt that proves the material went where the law says it went, which is a useful thing to be holding if a question is ever asked about a renovation years later, for instance when the house is sold.
The fines are not small
The NSW EPA's penalty schedule is designed to make dumping the expensive option. On the spot fines for doing the wrong thing with asbestos waste run up to $7,500 for an individual and $15,000 for a company, and matters that go to court carry maximum penalties of $1,000,000 and more, with the maximums doubled where the dumped waste contains asbestos. Set that against the real cost of lawful disposal for a few sheets of fibro and the arithmetic makes itself.
What we do, and what we hand to a licensed removalist
Druid Removal takes on bonded asbestos jobs within the 10 square metre unlicensed limit: the broken fence panel, the small eave section, the wrapped and stacked sheets a renovation has already produced. We follow the SafeWork conditions the allowance depends on, and the load goes to a facility licensed to take it.

Storm damage is the version of this job that cannot always wait for a convenient booking, a snapped fibro fence panel across a footpath, or sheeting brought down off an old shed. We take emergency call-outs, and the same rules travel with the urgency: the material still gets wetted, wrapped and taken to a licensed facility, just sooner.
Just as important is what we do not do. More than 10 square metres of bonded material needs a Class B removalist. Anything friable needs Class A. When a job is over the line we say so at the quote stage and point you at the right kind of contractor, because the line is the law, not a negotiating position.
That assessment costs you nothing. Quotes are free, and telling us what the material is, where it is and roughly how many square metres are involved is usually enough for a straight answer on whether it is a job we can take. We cover the Northern Rivers, from Kingscliff and Cabarita Beach through to Byron Bay and beyond.
Renovation loads are where the two halves of our work meet. A strip out produces one pile that is mostly ordinary demolition waste with a few suspect sheets leaning against it, and those two things have completely different journeys ahead of them. The suspect material gets identified, measured and handled under the rules above, and the rest travels as general construction waste. Mixing them to save a trip is precisely the thing the penalty schedule was written for.
Where to start
And if you are genuinely unsure whether the material contains asbestos at all, that question has a proper answer too. A sample can be tested by a laboratory, and the cost of testing is small against the cost of guessing wrong in either direction: treating harmless fibre cement like a hazard wastes money, and treating asbestos like harmless sheeting is the expensive mistake this whole article is about.
Measure before you plan anything. If the suspect material is bonded and under 10 square metres in total, it is a job that can be handled quickly and lawfully, and we can quote it from a couple of photos and the measurements. If it is bigger, or crumbly, or fire damaged, the same message gets you a straight referral instead. Either way, get in touch and say what you are looking at. The one option that never works out cheaper is the trailer run to somewhere quiet.